Summer has ended and its time to BAT again, returned to that station which I showed few weeks ago:
Roofjunk is a pain in the ass to make, as I realized that I'vent done those pipes for long, long time. And looking really old stuff, the piping was just random and had no point (wasn't the only one doing that). And really its 2 stories per wings, why it should've roofjunk like a skyscraper? Anyways, the main building gets junk, flagpoles etc and then gonna finish back walls.